-
Main Corporate Website
-
XPS
-
Glencore Technology
-
Zipatank
-
Hypersparge
-
IsaKidd
-
IsaMill
-
IsaSmelt
-
JamesonCell
-
Albion Process
-
Viterra
-
Aquarius Energy
-
Glencore in South Africa
-
Glencore in the DRC
-
Mutanda Mining
-
Kamoto Copper Company
-
Astron Energy
-
Katanga Mining Limited
-
Glencore Australia
-
Viterra Australia
-
Bulga Coal
-
Liddell Coal
-
Mangoola
-
McArthur River Mine
-
Mt Owen Complex
-
Ravensworth operations
-
Ulan Coal
-
United Project
-
Wandoan Coal
-
West Wallsend
-
Murrin Murrin
-
Mount Isa Mines
-
Main MenuWho we are
-
Main MenuOur Technologies
-
Our TechnologiesIsaMill™
-
IsaMill™Advantages
-
How It Works -
Installations -
IsaMill™Knowledge
-
IsaMill™About
-
Contact
-
-
Our TechnologiesJameson Cell
-
Jameson CellAdvantages
-
Jameson CellHow it works
-
Installations -
Jameson CellKnowledge
-
About -
Contact
-
-
Jameson Concentrator -
Our TechnologiesAlbion Process™
-
Albion Process™Advantages
-
Albion Process™How it works
-
Albion Process™Installations
-
Albion Process™Knowledge
-
Albion Process™About
-
Contact
-
-
Our TechnologiesISASMELT™
-
Advantages -
ISASMELT™How it works
-
ISASMELT™Services
-
Installations -
ISASMELT™Knowledge
-
About -
Contact
-
-
ISASMELT™ F600 -
ISACONVERT™ -
ISACYCLE™ -
ISASMELT™ Test Hub -
Our TechnologiesISAKIDD™
-
Our TechnologiesHyperSparge™
-
ZipaTank™ -
Service, Engineering & Aftermarket
-
-
Main MenuKnowledge
-
Contact
Missed a webinar? Find the link to the FULL recording listed below.
Technology: IsaMill™
-
How IsaMill™ Can Cut Your Secondary Grinding Energy in Half
Language: English
Presentation Date: September 2024
In this presentation, our experts will take you through:
- An overview of the IsaMill™ technology.
- Why Glencore Technology is moving into Coarse Grinding trials now.
- The efficiency gains that can be made when using an IsaMill™ upfront in your circuit.Click to download the presentation -
Glencore Technology conducted a Secondary Grinding replacement trial at Hudbay’s Stall Mill in Manitoba, Canada. The purpose of this trial was to conduct a proof-of-concept test to demonstrate the effects of 8micron and 10 micron ceramic media in an IsaMill™ and investigate the influence of media SG. In these trials, substantial reductions (>50%) in specific energy were observed compared to tumbling mills; this presentation outlines the findings of that large-scale testwork campaign and the potential for the IsaMill™ operating in coarser duties.
Click here for the recording
Technology: Jameson Concentrator
-
More from Less with Jameson Concentrator
Language: English
Presentation Date: August 2024
In this presentation, our experts will address the differences between the conventional and Jameson Concentrator design approaches with a focus on the application of Jameson Cells in rougher / scavenger duty with coarser feed. Furthermore, it will show the key findings of a trade-off study between a conventional circuit and a Jameson Concentrator supported by other case studies and test results.Click to download the presentation -
It is possible to significantly cut OPEX and CAPEX of new flotation plants with the Jameson Concentrator.
Residence time has remained the main design criteria for conventional flotation circuits made up of mechanical cells. Increasing the volume of mechanical cells has been the major trend in the industry to manage high throughput and slow flotation kinetics over the last 100 years. However, the Jameson Cell offers unparallelled fast flotation kinetics with its improved hydrodynamics and small air bubble size. Leveraging fast flotation kinetics and high upgrade ratios, the Jameson Concentrator is a small-footprint solution that can reduce CAPEX and OPEX of new projects.
Click here for the recording
Technology: Jameson Cell, IsaMill™ and Albion Process™
-
Driving Stagewise Implementation with Jameson Cell, IsaMill™ and Albion Process™
Language: English
Presentation Date: July 2024
In this event you'll have a chance to get an overview of the IsaMill™, Jameson Cell and Albion Process™ technologies and how their flexibility allows you to get a full plant up and running taking it one process at a time.Click to download the presentation -
Is CAPEX becoming a restriction for your project?
Junior mining companies often face CAPEX constraints. This makes it difficult to finance a complete processing plant. Glencore Technology offers modular and flexible technologies that allow you to improve your flowsheet in stages. Small increases in production and revenue are achieved. This revenue can be used to build the downstream areas of the plant. This webinar will show you some of our technologies and the economic advantages of a staged implementation over conventional plant construction.
Click here for the recording
Technology: ISASMELT™
-
ISASMELT™: Approach to a sustainable and competitive production - Arsenic distribution
Comparison of Arsenic Management in Chilean Smelters with the ISASMELT™ and ISACONVERT™ TSL Technology Approach.
Language: Spanish
Presentation Date: May 2024
In this event you will be able to see how our technologies have demonstrated, in real operations, their effectiveness in Arsenic management, without decreasing operational capacity or incurring higher costs.
We will explore the state of the art of Arsenic distribution and fixation in 7 smelters in Chile with traditional technology, and how these compare to ISASMELT™ technology.Click to download the presentation -
This is the second of 2 webinars in the series "Approach to a sustainable and competitive production".
In this 60-minute interactive webinar, Oscar Mendoza will present the results of an investigation on the state of the art of Arsenic distribution and fixation in 7 smelting plants in Chile and how, compared to traditional technologies, ISASMELT™ technology excels in the management of this impurity, without decreasing production capacity or generating increases in operating costs.Click here for the recording
Technology: ISASMELT™
-
ISASMELT™: Approach to a sustainable and competitive production - how much does a furnace cost?
ISASMELT™: Transforming Chilean Pyrometallurgy towards Sustainable and Competitive Production
Language: Spanish
Presentation Date: May 2024
At this event you will learn why ISASMELT™ is the most cost effective copper (Cu) smelting technology on the market.
In addition, you will see success stories of using SASMELT™ in operations around the world and the OpEx benchmark showing that 2 of the 3 lowest operating cost smelters are based on ISASMELT™.Click to download the presentation -
This is the first of 2 webinars in the series "Approach to a sustainable and competitive production".
In this 60-minute webinar you will explore how Australia's ISASMELT™ technology has become a robust and proven alternative for smelting copper concentrates, offering significant benefits in terms of sustainability, efficiency and profitability.
You will see ISASMELT™ success stories from different mining operations around the world such as Germany, Belgium, China, Peru and Zambia; plus the OpEx benchmark showing that 2 of the 3 lowest operating cost smelters are ISASMELT™ based.Click here for the recording
Technology: ISACYCLE™
-
How an ISACYCLE™ can be used for Small Scale Recycling Operations for urban waste
Language: English
Presentation Date: November 2023
ISACYCLE™ takes proven ISASMELT™ technology and applies to recycling e-waste and copper scrap. But how does it work?
This webinar is aimed at providing viewers with a good understanding of the advantages of an ISACYCLE™ facility, along with comparisons to alternative technology options.
Some of the key learning outcomes we aim to offer are -
- How ISASMELT™ is flexible and clean.
- How ISACYCLE™ takes this tech and applies it to recycling.
- How ISACYCLE™ is being deployed right now in the real world.Click to download the presentation -
In this 40 minute webinar, you'll be taken through a smelter design that can be installed and operated near the sources of urban waste streams.
You'll see how the operation of small ISACYCLE™ facility, along with comparisons to alternative technology options.Click here for the recording
Technology: Jameson Cell
-
Case Studies of Improved Copper and Moly Flotation with Jameson Cells
Language: English
Presentation Date: August
Do you want to improve your Copper and Moly flotation recovery?
Learn how Jameson Cells and Jameson Concentration can be best utilised for both Greenfield and Brownfield copper and molybdenum flotation plants?
Jameson Cell popularity is continuing to grow as a technology of choice within these two comodities. This presentation covers the results seen in recent installations at site, and pilot operation results for future installations.Click to download the presentation -
In this 60 minute presentation, you'll have a chance to get an overview of the Jameson Cell Technology, discuss case studies of succesful applications around thge world and the advantages of equipping a Jameson Cell.
Click here for the recording
Technology: ISASMELT™
-
Copper Elements: Maximise the Performance and Productivity of Your Furnace
Language: English
Presentation Date: September 2022
Chances are your smelting operation is still using cooling techniques developed in the 1940s. Glencore Technology can bring your operation into the 21st century! Join Mechanical Engineer Mark Letchford and our panel of pyrometallurgical experts to discuss how copper cooling elements came to be and how they can be used in your operation to help achieve your goals.Click to download the presentation -
In this 45 minute webinar you will learn:
- what copper elements are and how they differentiate from other cooling techniques
- How they can be tailored to your operation to achieve your goals
- How they are safer, more reliable, and more affordable than any other cooling technique available today. .Click here for the recording
Technology: IsaMill™
-
Maintaining Your IsaMill
Language: English
Presentation Date: September 2022
Get your questions answered by the experts at the latest free online workshop from Glencore Technology! In this latest workshop, you have unprecedented access to a panel of our experts from the Projects and Engineering, Aftermarket, Maintenance, and Electrical and Instrumentation teams. They are here to help you with questions on any topic to make sure your IsaMill™ performs above and beyond. -
What you will learn:
- Tips and tricks to get the most out of your IsaMill™, reducing downtime and maximising productivity
- Key Maintenance Attributes of an IsaMill™ that make it easy for you to perform regular maintenance
- All about the latest developments in IsaMill™ designs, developed with your feedback in mindClick here for the recording
Tecnology: Jameson Concentrator
-
Jameson Concentrator: Energy Efficiency in a Small Space
Language: Spanish
When: August 2022 (Latin America)
Are your ore grades getting lower and lower and this has driven up operational costs? Have you felt the pressure of an increasing number of ESG requirements? Or would you like to solve maintenance complications and transform your workplace into a safer and more productive operation? This webinar will demonstrate that the Jameson Concentrator, using high intensity technologies, is capable of producing huge CAPEX and OPEX cost reductions that will enable your operation to achieve its ESG objectives and increase productivity. -
In this 45-minute interactive webinar you will learn:
- what the Jameson Concentrator is and the advantages of its design.
- how the Jameson Concentrator solves common problems encountered with conventional concentrators and the benefits it offers.
- how Glencore Technology supports all stages of a project to increase productivity and profitability.Click here to access the recording
Technology: Albion Process™
-
MASTERCLASS: Designing the Ultimate Refractory Gold Plant
Language: English
Presentation Date: July 2022
Get more gold out of your ore by tailoring a refractory gold plant to match the needs of your feed. The Albion Process™ is a highly adaptable and effective leaching system that can deliver up to 97% recoveries in refractory gold. In this new webinar, our expert metallurgists will walk you through the options to design and upgrade your refractory gold plant to reduce your running costs and increase your productivity. You will learn about the applications and benefits of various plant designs, what testwork you need to get started, and how to calculate your projected CapEx and OpEx depending on the makeup of your feed. Skip the cost and confusion associated with hit and miss testing and inaccurate projections and watch now to get an inside track on designing the ultimate refractory gold plant.Click to download the presentation -
In this 20 minute webinar you will learn:
- What the Albion Process™ is and how it delivers high recoveries at a lower cost
- How to design the ultimate oxidative leaching plant to get the most out of your refractory gold
- How to generate an order of magnitude cost estimate for your project.Click here to access the recording
Technology: Jameson Concentrator
-
Jameson Concentrator: Energy Efficiency at a Reduced Footprint
Language: English
Presentation Date: May 2022
Is your operation struggling with declining ore grades driving up operational costs? Have you noticed the pressure from an increasing number of ESG requirements? Or would you like to solve maintenance hassles and make your workplace a safer, more productive operation? This webinar will demonstrate how the Jameson Concentrator, utilising high-intensity Jameson Cells and IsaMills, can offer huge reductions in capex and opex costs, helping your operation achieve its ESG goals and increase productivity.Click to download the presentation -
In this 45-minute, interactive webinar you will learn:
- What the Jameson Concentrator is, and its design advantages.
- How the Jameson Concentrator solves common issues found with conventional concentrators and offers benefits.
- How Glencore Technology can assist across all stages of a project to increase productivity and returns.Click here to access the recording
Tecnology: Albion Process™
-
Maximising Base Metal Recovery with Albion Process™.
Language: Spanish
When: May 2022
Are you looking to improve the efficiency of your flowsheet and get better results from your current processes? This webinar will demonstrate how we can use Albion Process™ to separate sulphides as concentrate. From here, you can leach the remaining metals in solution or separate them into tailings for recovery in a downstream circuit, maximising the recovery of these metals and increasing productivity in your systems, at lower capital and risk.Click to download the presentation -
In this 45 minute session you will learn:
- How Albion integrates into an existing flowchart.
- How it works with low capital and high tolerance.
- How the technology has been proven in real cases.
- How the Albion Process™ works and how it works in your mine.Click here to access the recording